PMP 8#

 0    29 flashcards    JuliaKarpetaKaczmarek
download mp3 print play test yourself
 
Question Answer
Activity network diagram
start learning
These diagrams, such as the project network diagram, show the flow of the project work.
Affinity diagram
start learning
This diagram breaks down ideas, solutions, causes, and project components and groups them together with other similar ideas and components.
Benchmarking
start learning
Comparing any two similar entities to measure their performance.
Checklist
start learning
A simple approach to ensure that work is completed according to the quality policy.
Control chart
start learning
A quality control chart that maps the performance of project work over time.
Control quality
start learning
An inspection-driven process that measures work results to confirm that the project is meeting the relevant quality standards.
Cost of conformance
start learning
This is the cost associated with the monies spent to attain the expected level of quality. It is also known as the cost of quality.
Cost of nonconformance to quality
start learning
The cost associated with not satisfying quality expectations. This is also known as the cost of poor quality.
Cost-benefit analysis
start learning
A process to study the trade-offs between costs and the benefits realized from those costs.
Design of experiments
start learning
An approach that relies on statistical scenarios to determine what variables within a project will result in the best outcome.
External QA
start learning
Assurance provided to the external customers of the project.
Flowchart
start learning
A diagram illustrating how components within a system are related. Flowcharts show the relation between components, as well as help the project team determine where quality issues may be present and, once done, plan accordingly.
Internal QA
start learning
Assurance provided to management and the project team.
ISO
start learning
"The abbreviation for the International Organization for Standardization. ISO is Greek for “equal,” while “International Organization for Standardization” in a different language would be abbreviated differently. The organization
elected to use “ISO” for all languages."
start learning
elected to use "ISO" for all languages. "
Matrix diagram
start learning
A data analysis table that shows the strength between variables and relationships in the matrix.
Pareto diagram
start learning
A histogram that illustrates and ranks categories of failure within a project.
Quality
start learning
According to ASQ, the degree to which a set of inherent characteristics fulfills requirements.
Quality assurance
start learning
A management process that defines the quality system or quality policy that a project must adhere to. QA aims to plan quality into the project rather than to inspect quality into a deliverable.
Quality management plan
start learning
This plan defines how the project team will implement and fulfill the quality policy of the performing organization.
Quality metrics
start learning
The operational definitions that specify the measurements within a project and the expected targets for quality and performance.
Quality planning
start learning
The process of first determining which quality standards are relevant to your project and then finding out the best methods of adhering to those quality standards.
Rule of Seven
start learning
A component of a control chart that illustrates the results of seven measurements on one side of the mean, which is considered “out of control” in the project.
Scatter diagram
start learning
A quality control tool that tracks the relationship between two variables over time. The two variables are considered related the closer they track against a diagonal line.
Seven basic quality tools
start learning
These seven tools are used in quality planning and in quality control: cause-and-effect diagrams, flowcharts, check sheets, Pareto diagrams, histograms, control charts, and scatter diagrams.
Statistical sampling
start learning
A process of choosing a percentage of results at random. For example, a project creating a medical device may have 20 percent of all units randomly selected to check for quality.
System or process flowcharts
start learning
Flowcharts that illustrate the flow of a process through a system, such as a project change request through the change control system, or work authorization through a quality control process.
Tree diagram
start learning
Tree diagrams show the hierarchies and decomposition of a solution, an organization, or a project team. The WBS and an org chart are examples of tree diagrams.
Work performance information
start learning
The results of the project work as needed. This includes technical performance measures, project status, information on what the project has created to date, corrective actions, and performance reports.

You must sign in to write a comment